+86 158-1484-7343
官方微信
掃一掃了解更多
1)Leveling the surrounding and partition wall foundation, make it more solid with reinforced concrete;? 2)Then set up columns, horizontal beams will be connected to the skeleton, partition, exterior wall panels and door and window frames;? 3)Laying the floor, and then up on a layer, and then on the roof frame and roof panels;? 4)Install windows, doors, sanitary ware and hardware, etc.? |